Sheet 1: Network schedule of works. Schedule of labor movement. Schedule of delivery of materials. Schedule use of construction equipment. Technical and economic indicators.
Sheet 2: Stroygenplan. The incisions. Conventional notation. Safety instructions. Explication of temporary household and storage facilities. Technical and economic indicators.
The contents of the explanatory note:
Introduction 2
1.Section: "Planning" 4
1.1. Input 4
1.2. Buildings 5
1.3. Bill of Quantities 11
1.4. Statement of labor and computer time 13
1.5. Resource and Network Resource Identification Card 17
1.6. Organization of work on the network schedule 22
1.7. List of requirements for building materials and products 23
1.8. List of requirements for machines and mechanisms 25
1.9 Analysis of the workforce movement schedule 26
1.10. Calculation of technical and economic indicators 27
2. Section: "Organization of a construction site" 28
2.1. Basic solutions for the construction plan 28
2.2. Determining the parameters of cranes 29
2.2.1. Determination of the parameters of the tower crane 29
2.2.2. Determination of crawler crane parameters 30
2.3. Calculation of temporary accommodation 32
2.4. Calculation of temporary storage facilities 33
2.5. Calculation of temporary water supply 34
2.6. Calculation of temporary power supply 36
2.7. Calculation of technical and economic indicators 38
2.8. Safety at work site 39
References 40
Download sample:
http://pgsfiles.ru/engine/download.php?id=94 [557,29 Kb]
Note: The file format is RAR archive [851,49 Kb]: Drawings in the format: DWG - Autodesk AutoCAD + Explanatory note in the format: DOC - Microsoft Office Word